PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling and compacting along foundation walls at column line A (1-2) (800x600).jpg Backfilling and compacting inside Stair -2 (800x600).jpg Bolting Derrick -1 Facing South (800x600).jpg Bolting Derrick -1 Facing South Pic -2 (800x600).jpg Column D-2 (800x600).jpg Derrick -2 Facing North-West (800x600).jpg Pouring concrete at Elev. 7-Stair -4,5 shear walls (2nd Floor) Facing South-East (800x600).jpg Preparing to pour concrete at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg UCFC Site facing East (800x600).jpg
Previous pageNext page Column D-2 (800x600)
Column D-2 (800x600)